Project profile: Improving switchgear inspections at London's Stansted Airport

In this project profile, Lonsdon Stansted Airport Engineering Team performed an existing building retrofit in order to reduce the amount of time needed for maintenance inspections.

03/20/2014


Project name: Improving Switchgear Inspections at London's Stansted Airport

Project type: Existing building retrofit

Engineering Firm: London Stansted Airport Engineering Team

Building type: Utilities/public works/transportation

Location: Stansted, Essex, United Kingdom

Timeline: Nov. 11, 2012 - Dec. 24, 2012


Thermographer inspects switchgear at Stansted Airport through an IRISS CAP infrared camera. Courtesy: London Stansted Airport

Building details

London Stansted Airport has permission to handle 35 million passengers annually and currently 17.5 million people pass through the terminal building each year. The airports electrical structure is enormous. Power is brought onto the site at 33kV and transformed down to 11V. 

Project details

At best, Stansted's engineers had four hours per night in which to conduct predictive maintenance inspections. By the time they had the system safe, the window of opportunity was reduced even more. This meant the entire inspection cycle was significantly protracted and no system could be checked under load. With the installation of IRISS CAP Series infrared inspection windows, the savings in terms of inspection time and associated costs went up dramatically. Payback was instant, but the benefits extended beyond that.

With IRISS infrared windows, Stansted Airport switchgear systems are thoroughly inspected. Courtesy: London Stansted Airport

Project success

Once the IRISS windows were installed there was an immediate impact on switchgear inspections time. It took just took five hours to complete the job in daylight hours, including walking from one substation to the next and coffee breaks. Previously, it took the engineers two nights to inspect just one panel. There is no longer a need for isolations or back feed, and the engineers' safety is completely assured. A single thermographer with a thermal imaging camera and without PPE can do everything. An initial thermal survey of the fully energized low-voltage systems that serve the main terminal block showed just two minor cable faults. For the first time, the airport had a benchmark for trending future performance and the complete assurance that everything was working optimally. This was not possible before install the IRISS CAP Series IR window.


London Stansted Airport, Enterprise House, Bassingbourn Road, Essex, United Kingdom CM24 1QW



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.