Reduced corrective maintenance is found money

Better management of corrective and preventive work orders means a more efficient maintenance team will provide workers more capacity and reduce unnecessary overtime

03/29/2013


You know that feeling you get when you find a $20 bill that you left in your jeans pocket after it went through the wash? Found money! That happened to me the other day and I thought to myself, where else can you find hidden money?

In fact, there is a fair amount of money lurking in the corners of your maintenance department, but you have to know where to look. CMMS helps you cut needless expenses or improves asset capacity, which equals found money, with an added benefit: Management views you as a rock star. 

Reduce overtime

CMMS can streamline your staff operations. Better management of corrective and preventive work orders means a more efficient maintenance team. In some cases your staff may want overtime, but management doesn’t agree. Optimize the team’s workload and schedule by analyzing work order data. These efficiencies will allow them to get more done during the day, giving them more capacity and reducing unnecessary overtime. Found money!

A recycling company’s East Coast plant claims CMMS gave it the ability to analyze staff performance through work order history and cut way back on overtime costs by hiring more qualified technicians. The CMMS also helped analyze replacement part usage and the plant found ways to cut parts inventory costs. The result? Maintenance costs per ton dropped by nearly 40% annually. 

Reduce downtime/improve uptime

One of the primary goals of CMMS is to give you an improved PM/corrective maintenance ratio. PMs are proven to reduce corrective maintenance, which leads to less downtime. Increase uptime, increase production, and improve service to clients. Do the math; even a small improvement in uptime can give you greater capacity to produce goods. Found money!

A dairy manufacturer reduced equipment downtime with its CMMS by scheduling simple tasks like replenishing the oil in a gear box—tasks that are often ignored until a machine breaks down. By creating PMs—large and small—for more than 1,500 pieces of equipment, the maintenance department squeezed more than 30% out of the budget. The company’s CMMS administrator trumpets his favorite slogan: “Oil and grease is cheap, parts are not.”

Asset preservation

Have you ever had equipment fail to the point where it needed to be replaced or overhauled, unexpectedly? A maintenance related issue had something to do with it, no doubt. Imagine catching those problems before they occur. CMMS shows impending problems, equipment likely to fail, problem trends, etc. Unattended, these problems can lead to catastrophic failure and a lot of disruption in your operations. Prevent these failures and you have found money!

A small food processor in the Midwest improved machine uptime and food safety compliance while cutting maintenance costs by approximately $50,000 per year. 

While I probably should have checked my jeans pocket before I put it in the wash, CMMS users should look beyond the fundamental PM-work order capabilities and find money hidden in the benefits of proactive maintenance management.

Paul Lachance is president and chief technology officer for Smartware Group, producer of Bigfoot CMMS for organizations worldwide. He can be contacted at paul.lachance(at)bigfootcmms.com. Check out his new blog at www.PlantEngineering.com. 



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.