A robust control system is critical for a reliable paralleling system. A control system must minimize single points of failure and have built-in fault tolerance measures. Key factors in a paralleling control include the following. 

Eliminate single points of failure. The most effective way to eliminate single points of failure in a control system is to use distributed logic and control rather than centralized control. Critical control functions such as generator starting, bus voltage sensing, synchronizing, and closing to the bus should be executed by individual generator set controls rather than a master control. This way, the system will have redundancy in critical control functions in addition to redundant generators, eliminating the single point of failure. 

  • Generator starting: In a simple standby isolated bus paralleling application, the start signal is sent directly from the transfer switches that sense the utility failure to the generator sets. Sending the signal through a master control adds no value and introduces an unnecessary failure mode. Sending the start signal directly to the generator sets for the transfer switch contacts is the simplest, most reliable means of starting the generators.
  • Paralleling bus voltage sensing: For reliable paralleling, each generator must sense the bus voltage independently rather than rely on a signal from a separate control
  • Closing to a dead bus: When closing to a dead bus, the system must include an arbitration scheme to prevent multiple generators from closing to the bus at the same time. To provide the fastest and most reliable service to a dead bus, the arbitration and breaker control logic must be resident in the generator controls rather than in a master control. Waiting for a permissive signal from a master slows the system down and adds an unnecessary failure mode.
  • Synchronizing and closing to a live bus: Generator sets synchronize reliably and quickly when the bus sensing and synchronizing logic is part of the generator set control. External controls adjusting the generator set frequency and voltage in an attempt to synchronize with the bus introduce unnecessary complexity into the system.  

Figure 1: Implementing a load add function: Connecting the normally closed aux contact of each genset’s paralleling breaker in parallel to the ATS transfer inhibit input will prevent the ATS from transferring to the emergency source until all of the gener

Load add and load shed. Load add and load shed schemes ensure that there is always sufficient capacity to serve the most critical loads; less critical loads are served as capacity becomes available. Two levels of load add (one level for emergency loads and one level for all other loads) and one level for load shed (emergency loads are never shed) are sufficient for most simple, isolated bus paralleling applications. This can be implemented without the use of a master control. However, a master control may be required for additional levels of load add/shed. Although a master control can present a single point of failure, the system can be designed so that failure of the master will not impact the most critical loads. 

A load add scheme is required in a paralleling system when a single generator is not large enough to carry all of the loads in the system. A simple load add scheme with two levels can be implemented using the inhibit function of the non-emergency load transfer switches and the aux contacts of the genset paralleling breakers (see Figure 1). Emergency load transfer switches should not be inhibited and should close to the bus as soon as it is live. Non-emergency transfer switches can be inhibited until all of the generator sets come on line.



Anonymous , 05/08/13 10:25 AM:

Excellent Article.
VISH , CA, United States, 05/08/13 12:53 PM:

Some of the increased cost of the parallel system can be off-set by Peak Load shaving technique. Illustration of Pros and cons of the system will greatly help the engineers to make the right decision.
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.