Report on building energy consumption released
The IMT's report, Building Energy Transparency, was compiled using data from five cities and two states regarding commercial building owners measuring their properties' energy consumption.
The Institute for Market Transformation (IMT) released the first national review (PDF) for building energy ratings and disclosure policies in the United States. The policies, which have been enacted into law by several states and cities throughout the U.S., require commercial building owners to measure their properties’ energy consumption and disclose the data.
The purpose of these laws is to make energy consumption more transparent to tenants, owners and the general public. The laws also encourage improving energy efficiency in buildings and help stimulate the demand for new technologies and concepts to that effect.
The report, Building Energy Transparency, is a review of building energy rating and disclosure laws in the cities of San Francisco, New York City, Seattle, Washington, D.C. and Austin, Texas. The states of California and Washington were also including. It is expected the report will affect 4 billion square feet of building space.
A compact user’s guide by CB Richard Ellis has also been released, titled “Guide to State and Local Energy Performance Regulations,” which can be downloaded.
Integrator Guide
| Search the online Automation Integrator Guide |
|
|
|
|
Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.
Case Study Database
Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.















