Revised LEED demand response credit requirements

Pilot credit encourages U.S. Green Building Council LEED building projects to become active players in the emerging Smart Grid.

06/16/2011


The U.S. Green Building Council (USGBC) recently announced the release of the comprehensively updated LEED Demand Response Pilot Credit. Originally launched in 2010, the revised and enhanced Demand Response Pilot Credit establishes guidelines that are anticipated to increase participation in automated demand response programs. Leading industry experts from the Demand Response Research Center at Lawrence Berkeley National Lab (LBNL), Schneider Electric and Skipping Stone contributed to the development of the credit.

LEED projects that satisfy the credit by demonstrating their ability to shift energy consumption during peak events by 10% of peak load demand will earn a point towards LEED certification when they participate in existing utility-sponsored demand response programs that meet guidelines established in the pilot credit. Additional points are available for projects that implement semi or fully automated demand response programs in their buildings.

“By forming a team leveraging the demand response research from LBNL, energy market expertise from Skipping Stone and our own diverse and deep experience with buildings, we believe this credit will really make a difference in the overall smart grid adoption by the commercial sector,” said Jim Anderson, vice president USA Utility and Smart Grid Business for Schneider Electric.

USGBC is currently finalizing plans for the implementation of a concentrated market test of the Demand Response Pilot Credit. The market pilot test will be launched in select utility territories to promote the new credit and spark widespread adoption of demand response within the building community. The program will also include an education and market feedback mechanism to foster knowledge-sharing and measure the impact the building community can have on the grid and the environment. The pilot test is currently being developed as a partnership leveraging stakeholder support through utilities and demand response program providers, enabling technology companies and companies that service the building and energy communities.

“Demand response is unique,” said Mark MacCracken, Chairman of Board of USGBC. “To achieve success, this LEED credit requires coordination between the building community, utilities and wholesale power market operators with qualified programs. We believe that the new requirements create a straightforward framework for LEED teams to implement demand response, while delivering benefits to both the power grid and to the environment.”



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.