Seven steps to training success
By Jeff Shiver CMRP, Aladon Network RCM2 Practitioner
When possible, require certification to validate your investment in the skills and knowledge of the craft workers. There are numerous certifications in the condition monitoring approaches (lubrication, vibration, infrared) as well as others.
At this point, you have determined the organization needs, assessed, created individual development plans, created the training schedule, and educated your group. The sixth step is to create metrics or key performance indicators that validate the training return on investment (ROI). With a little thought, you should be able to tie increased performance directly to your training activities effectiveness.
An easy one for starters is seeing an extended mean time between failure (MTBF). Another is measuring rework that occurs within 30 or 60 days following an intervention or PM activity.
Now for the seventh and final step: the continuous improvement feedback loop. You should be constantly assessing the current state. Failures should be moved through a root cause/problem solving analysis process. If training is identified as a possible cause, the training needs along with the skills and knowledge priority matrix should be reviewed and changed as required.
In addition to being driven by failure events, new equipment and methods should be reviewed and integrated into the training process as well. Then, an ongoing process of skills and knowledge assessment followed by education and application of skills must be in place to remain at the top.
With this seven-step process, not only will you have developed a skills and knowledge development approach for your existing craftspeople, but you also have visibility to the skills you should be interviewing for when hiring external candidates. In addition, you also have visibility to the entry-level skills and knowledge requirements necessary for an apprenticeship program. The apprenticeship program can provide a progression path for high-potential operators that are already familiar with your plant and equipment.
- Jeff Shiver CMRP, Aladon Network RCM2 Practitioner
Integrator Guide
| Search the online Automation Integrator Guide |
|
|
|
|
Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.
Case Study Database
Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.















