Single loop controller qualified for nuclear service
Yokogawa YS1700 Single Loop Controller is now qualified to be used in nuclear applications, non-safety seismic, and safety seismic applications, including nuclear safety. It is also used in industries such as power, petrochemical, water, pulp/paper, marine and municipal boilers.
Yokogawa's Single Loop Controller, the YS1700, also has been qualified for non-safety seismic and safety seismic applications, including nuclear safety, and is also used in industries such as power, petrochemical, water, pulp/paper, marine and municipal boilers. The nuclear safety and seismic application qualification was based on EPRI TR-107330 under and audited quality management program meeting the requirement of 10CFR50 Appendix B, NQA-1, and 10CFR21.
Control applications in nuclear facilities are numerous, and the YS1700 is applicable to many of them including; feed water control, feed water heater, heater drain control, heat exchanger temperature control and many other flow, level and pressure applications.
The YS1700 features include dual CPUs with automatic fail over, which provides display and manual control capability if an abnormality occurs in one of the CPUs. Other features include a hard manual backup, battery free memory backup, and backwards compatibility with all previous YS control products.
Yokogawa Corporation of America
- Edited by Chris Vavra, Control Engineering, www.controleng.com
Integrator Guide
| Search the online Automation Integrator Guide |
|
|
|
|
Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.
Case Study Database
Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.















