Software integration: 8 tips for project success

04/23/2009


Communication is key when working with a system integrator, according to a recent Reed Business Information survey. Eight key tips follow to ensure those involved explain project details with stakeholders; disseminate decisions to all responsible for designing, implementing or using the system; and make sure everyone understands what needs to be done, along with why and how. Learn more, below.
Related reading from MBT :

Best-in-class report proves out commonsense guide: minimize change

; and

System selection: When—and how—to choose custom software applications

.
In a recent survey of more than 1,800 system integrators another Reed Business Information publication asked for tips to ensure the success of an automation project. Hundreds responded, commenting on how to pick an integrator, design the automation system, manage the project, test the finished product and otherwise get the desired results for the end user. Above all else, respondents advised their clients to communicate effectively. Eight key tips follow, all applicable to software integration efforts.
1. Communicate early and often, even before the first line of code is written.
The client needs to give a prospective integrator full access to all plant personnel directly involved with the proposed project, as early in the buying cycle as possible.
2. Define the stakeholders on both teams and determine who needs what information.
3. End users need to read all documents their integrators give them; clarify where needed; 80% of problems with projects are a lack of the proper communications between the client and the integrator.
4. Communicate with all involved throughout the process: managers, operations, so everyone becomes champions rather than opponents.
5. Designate someone in-house to “own” the project.
6. Use communication tools such weekly production meetings to manage action lists. End users should have project meetings with their integrators at least monthly, obtaining commitments, assigning dates and a person responsible for each, and follow up.
7. End users should modify system requirements and designs as capabilities, interactions, and implications emerge, since these things are rarely known or anticipated at the beginning, communicating with the integrator, with a methodology to handle changes.
The eighth point is often forgotten through commissioning and startup.
8. Continue communications beyond startup and operations , ensuring appropriate training is in place, defining deliverables, such as manuals, maintenance, and decommissioning, if needed.
– Edited by Mark T. Hoske, Reed Business Information, www.mbtmag.com





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.