Some fluorescents given 2-year reprieve

The Dept. of Energy has post-poned the "phase-out" date to July 14, 2014, for three T-8 general-service fluorescent lamps (GSFLs) after exception requests were filed by three companies.

05/07/2012


Responding to three individually filed exception requests, the U.S. Dept. of Energy (DOE) has postponed by two years – to July 14, 2014 – the “phase-out” date for 700-series T-8 general-service fluorescent lamps (GSFLs) manufactured by GE Lighting (GE); OSRAM SYLVANIA, Inc. (OSI); and Philips Lighting Company (Philips). Only companies that have been excepted by DOE may continue to manufacture or import the T-8 GSFLs in question beyond July 14, 2012. The lamps involved are the 4-foot medium bi-pin, 2-foot U-shaped, 8-foot Slimline, and 8-foot high-output 700-series T-8s. 

DOE’s Office of Hearings and Appeals (OHA) granted the extensions to GE, OSI, and Philips, all three of which are National Lighting Bureau sponsors. The basis for the exceptions was the growing scarcity and escalating cost of the rare-earth oxides used to manufacture the phosphors intrinsic to the proper functioning of fluorescent lamps. The severe supply/cost difficulties have been caused by manufacturing and export regulations subsequently instituted by China. According to the DOE OHA ruling, “China now controls approximately 97% of the world-wide supply of rare earth elements and rare earth oxides, and has adopted policies that have drastically reduced the volumes of rare earth elements and oxides that can be exported to U.S. lighting manufacturers.” 

The impact of China’s rare-earth market manipulations is underscored by a National Electrical Manufacturers Association (NEMA) report that world prices for terbium increased at an annual rate of more than 400% in 2011; for europium oxides, the 2011 escalation rate exceeded 500%. 

According to National Lighting Bureau Chair Howard P. Lewis (Lighting Alternatives, Inc.), the Illuminating Engineering Society of North America’s (IES’) representative on the Bureau board of directors, had the 700-series T-8 phase-out been allowed to take effect on July 14, 2012, 800-series T-8s would have been among the most logical alternatives. The cost of 800-series T-8s exceeds that of 700-series T-8s because the rare-earth content of 800-series T-8s significantly exceeds that of 700-series T-8s. Mr. Lewis observed that, “This ruling enhances affordability at a time when it’s needed. We applaud DOE for its good judgment, and GE, OSI, and Philips for seeking the exceptions.” 



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.