St. John Medical Center

Addition to existing building; St. John Medical Center; Thorson Baker and Associates Inc.

08/15/2013


Addition. Courtesy: Thorson Baker & AssociatesEngineering firm: Thorson Baker & Associates Inc.
2013 MEP Giants rank:
90
Project:
St. John Medical Center
Address:
Cleveland, Ohio, United States
Building type:
Hospital
Project type:
Addition to existing building
Engineering services:
Automation & Controls, Code Compliance, Electrical/Power, Fire & Life Safety, HVAC, Lighting
Project timeline:
April 2011 to July 2014
Engineering services budget:
$8.38 million
MEP budget:
$11.38 million

Challenges

Thorson Baker & Associates (TBA) is excited to be a part of completing the goals of St. John Medical Center, located in Westlake, Ohio. This project will enable the hospital to further its faith-based mission in Catholic health care while promoting its relationship with the 50/50 partnership between the Sister of Charity Health System and University Hospitals (UH), as well as strengthening its position as an educational hospital for the Ohio University College of Osteopathic Medicine.

The $50,000,000 project includes interior remodeling and two additions. The additions, which consist of approximately 36,000 sq ft, include a new outpatient entrance and lobby, biometrics area, PEDS, ENDO, same-day surgery, operating rooms, and pre-/post-op. The renovations incorporate approximately 76,000 sq ft and include an emergency observation unit, imaging, laboratory, operating rooms, progressive care unit, biometrics, central sterile rooms, and operating staff lockers and lounge.

The 146,000-sq-ft renovation of the site area includes the relocation of oxygen lines, main cold water lines, chilled water lines, and main electrical duct banks. The challenges of this project were to complete the design and construction affecting the entire complex while keeping the hospital in operation in a clean and healthy environment to provide at a minimum of LEED Silver Certification as specified by U.S. Green Building Council. Twenty additional TBA projects have received LEED Certification and 41 projects are registered and on track to receive certification. Continual challenges were to keep the project or budget and on schedule.

Solutions

To obtain the hospital’s goals, the team selected the Integrated Project Delivery (IPD) method approach to have a three-party agreement between the architect, the CM, and the owner. This method promotes the design team working together from the project's inception through its completion, in order to keep the project on schedule and within budget. TBA collaborates with the architect's team for the design using BIM (Revit) to model the additions and renovations, which helped the CM team to understand installation challenges before demolition started.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.