SEARCH Archives
Loading
Sponsored by:

Still Showing Weakness, Architecture Billings Index Increases Slightly

08/18/2010


Following a two-month soft patch, the Architecture Billings Index (ABI) rose almost two full points in July. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the July ABI score was 47.9, up from a reading of 46.0 the previous month. This score reflects a continued decline in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index dropped substantially from 57.7 to 53.1.

“Business conditions at design firms remain quite volatile,” said AIA Chief Economist Kermit Baker, PhD, Hon. AIA. “While this recent uptick is encouraging, this state of the industry is likely to persist for a while as we continue to receive a mixed bag of feedback on the condition of the design market from improving to flat to being paralyzed by uncertainty.”

Key July ABI highlights:

  • Regional averages: South (47.9), Northeast (47.2), Midwest (46.7), West (45.2)
  • Sector index breakdown: commercial / industrial (50.4), institutional (47.9), multi-family residential (47.5), mixed practice (42.9)
  • Project inquiries index: 53.1

About the AIA Architecture Billings Index

The Architecture Billings Index is derived from a monthly “Work-on-the-Boards” survey and produced by the AIA Economics & Market Research Group. Based on a comparison of data compiled since the survey’s inception in 1995 with figures from the Department of Commerce on Construction Put in Place, the findings amount to a leading economic indicator that provides an approximately nine to twelve month glimpse into the future of nonresidential construction activity. The diffusion indexes contained in the full report are derived from a monthly survey sent to a panel of AIA member-owned firms. Participants are asked whether their billings increased, decreased, or stayed the same in the month that just ended. According to the proportion of respondents choosing each option, a score is generated, which represents an index value for each month. The regional and sector data is formulated using a three-month moving average.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Nominate today - Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Robotic innovations, safety, Industrial energy management, Lambda tuning for PID, HMIs: All about software
CNC Way beyond traditional; Remote I/O, new approaches; Inside Process: APC, PID, cyber-security
Servodrive Control: Precise Power, PLCs vs. PACs, Virtualization, Best Products: Engineers' Choice Awards
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.


Poll of the Week

How integrated are your maintenance, controls, and instrumentation systems?
Fully integrated
Somewhat integrated
Loosely integrated
They're not


Click Here for Poll Archives
Sponsored by:

CFEMedia.com | Subscribe to Magazine | Advertise | Contact Us | About Us | Site Map | Privacy Policy
Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.