Study outlines strategies hospitals can implement to reduce energy use by 62%, save money

I found this study yesterday that identifies a process for newly constructed hospitals to integrate architectural, mechanical and central plant systems to reduce energy consumption by an average of 62%.

06/03/2013



Courtesy: Cannon DesignI found this study yesterday published by the University of Washington, titled Targeting 100! that identifies a process for newly constructed hospitals to integrate architectural, mechanical and central plant systems to reduce energy consumption by an average of 62%.

The biggest breakthrough identified by the study comes from addressing the reheating of centrally-cooled air, which is the largest contributor to wasted energy in a hospital, representing more than 40% of annual heating energy use. The study also identifies strategies including sun and daylight shading controls, vacant room sensors, outdoor air supply with heat recovery systems, modified air delivery systems, thermal energy storage and improved air-tightness and high insulation values in windows and walls that can help hospitals save between $500,000 and $800,000 a year in energy costs.

I read stories and studies like Targeting 100! and it makes me wonder why any hospital accepts less than these standards. Working with firms like Cannon Design, hospitals can begin implementing these measures to save money, energy and create stronger healthcare environments. Kudos to the University of Washington for pushing this study—it will help drive progress in our healthcare environments.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.