System integration water/wastewater blog: 'No contractual issues to delay us now.'

After months of delays, the SCADA system project at the Baton Rouge Wastewater Pump Station can continue. Stan Prutz's project diary continues.

07/10/2009


 

After months and months of bureaucratic and contractual delays, the design, assembly, configuration, and installation of a SCADA system at the Baton Rouge Wastewater Pump Station can continue.

Stan Prutz
Control Engineering blogger Stan Prutz, P. E. (CEO of QDS Systems Inc., Baton Rouge, LA) reports that the $2 million+ project to control 51 critical wastewater lift and booster stations serving the municipality's 412,000 residents is "proceeding as one would normally expect - no contractual issues to delay us now."

Get the history of the project , then follow this project diary to learn more about system design, integration and installation in a water/wastewater facility.

 

More System Integration, Engineering

Services news from Control Engineering

- Renee Robbins , senior editor
Control Engineering News Desk



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Mobile HMI; PID tuning tips; Mechatronics; Intelligent project management; Cybersecurity in Russia; Engineering education; Road to IANA
Save energy with automation; Process control system upgrades; Dispelling controll myths; Time-sensitive networking; Control system integration; Road to IANA
Additive manufacturing advancements; Machine vision enhances robotics; Fieldbus evolution; Process safety; Advice from System Integrators of the Year; Road to IANA
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Flexible offshore fire protection; Big Data's impact on operations; Bridging the skills gap; Identifying security risks
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
click me