Texas State University

Energy audits; Texas State University; EEA Consulting Engineers

08/15/2013


This image shows the entry sign to Texas State University. Courtesy: EEA Consulting Engineers

Engineering firm: EEA Consulting Engineers
2013 MEP Giants rank: 88
Project: Texas State University
Address: San Marcos, Texas, United States
Building type: School (college, university)
Project type: Energy audits
Engineering services: Cx/Retro-Cx, HVAC, Lighting
Project timeline: June 2012 to December 2012
Engineering services budget: $175,500
MEP budget: $175,500

Challenges

EEA conducted an energy audit of campus buildings such as Emmett and Miriam McCoy Hall. Courtesy: EEA Consulting EngineersThe timeline was a challenging aspect of this project. EEA's intent was to get the energy audit to the owner as quickly as possible so that implementation could begin and savings could be realized. The notice to proceed for the audit was given on May 16, 2012. By July 30, 2012, 3 million sq ft of space in 40 buildings had been surveyed and analyzed, and the first draft of the report had been delivered to the owner.

Solutions

To meet the compacted schedule, EEA gathered all available personnel resources to complete site work, process field data, identify energy conservation measures (ECMs), and compile the final report featuring ECM descriptions and associated paybacks.

Watch a video from EEA Consulting Engineers on this project.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.