Three ways to add measurable value to a manufacturing organization

How using a maintenance planner can increase wrench time, scheduled compliance, and make the manufacturing floor a more safe and efficient work environment.

05/09/2014


1. Maintenance planners can increase wrench time 

A typical maintenance worker's day can be filled with waste.  It is no fault of their own, but it's a plant manager's inability to plan and schedule that causes this waste to occur (See the graph).  Wrench time is defined as the time spent by maintenance personnel physically interacting with the equipment, such as making repairs, performing inspections, applying lubrication. For many organizations, wrench time accounts for just 35% of an employee's day. The remainder of the time goes to many non-value-added activities such as travel time or coordination delays. 

Wrench time is defined as the time spent by maintenance personnel physically interacting with the equipment, such as making repairs, performing inspections, applying lubrication. For many organizations, wrench time accounts for just 35% of an employee's day. Courtesy: ARG
Enter the maintenance planner. The planner's role is to shrink as many of these other factors as possible and add them back to the wrench-time component.  Research shows that we can achieve wrench-time values as high as 50% or 60% with a focused approach to scheduling and planning. 

2. Increase maintenance schedule compliance

Better-planned jobs yield better executed work. The more research and detail that goes into each job increases the accuracy of a plant manager's time estimates, which increases compliance with a schedule. The end result of schedule compliance is getting more of the most important work done in any given week.  This will reduce (or at least minimize) the impact of future failures.  The devils in the details here: greater efforts by the maintenance planner produce better time estimates, which enable superior execution.

3. Contributing to a safer, more efficient workplace

Sometimes the job of the maintenance planner can seem like a clerical nightmare where their job is to fill out the paperwork and account for parts and people‚Äôs time. But this is not an accurate portrayal. 

Here is what you add to the equation as a maintenance planner:

  • Safer execution through identifying the hazards in advance
  • Efficient execution through specifying the people, tools, and parts that will be needed.
  • Less busy work through collaborating with the workers on the best methods to be used when the work is executed.


Mike Gehloff has worked in the maintenance and reliability discipline for more than 20 years with a wide range of experience both as a practitioner and a consultant. Mike is the Discipline Leader for both the Work Execution Management and the Operator Care practices. He currently works with the Allied Reliability Group. (Link: http://www.alliedreliabilitygroup.com)

-Edited by Jessica DuBois-Maahs, associate content manager, CFE Media.  jdmaahs(a)cfemedia.com



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Intelligent, efficient PLC programming: Cost-saving programming languages are available now; Automation system upgrades; Help from the cloud; Improving flow control; System integration tips
Smarter machines require smarter systems; Fixing PID, part 3; Process safety; Hardware and software integration; Legalities: Integrated lean project delivery
Choosing controllers: PLCs, PACs, IPCs, DCS? What's best for your application?; Wireless trends; Design, integration; Manufacturing Day; Product Exclusive
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.
This article collection contains several articles on improving the use of PID.
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again