Building commissioning is one of the most important (and complex) types of projects an engineer can be tasked with. Renewable energy or sustainable systems require specialized expertise.

08/28/2013


Jerry Bauers, National director of commissioning, Sebesta Blomberg, Kansas City, Mo. Courtesy: Sebesta BlombergMichael P. Feyler, Co-director, building solutions group, RDK Engineers, Andover, Mass. Courtesy: RDK EngineersRobert J. Linder, PE, Senior project manager, Karges-Faulconbridge Inc., St. Paul, Minn. Courtesy: KFI EngineersJames Szel, Senior vice president, Syska Hennessy Group, New York City. Courtesy: Syska Hennessy GroupGeremy Wolff, Commissioning manager, McKinstry, Bellingham, Wash. Courtesy: McKinstryBarney York, Project manager, RMF Engineering, Baltimore. Courtesy: RMF Engineering

Participants


CSE: What cutting-edge energy efficiency systems have you recently commissioned? What design aspects or products were included?

RDK Engineers’ Building Solutions Group recently provided LEED commissioning for a new 183,000-sq-ft academic building at Boston College. Courtesy: RDK EngineersSzel: A heat recovery chiller harnesses the heat that is otherwise rejected from the chiller and typically released into the atmosphere. The heat recovery chiller recovers the “waste” heat from the chilled water unit and uses that heat for other applications in the building, like humidity control, HVAC reheats, or even potable hot water systems. Being that most buildings have a constant need for hot water regardless of the time of year, the heat recovery chiller can greatly reduce energy bills and a building’s carbon footprint year round.

York: I recently commissioned a 160,000 pounds/hour (PPH) condensing economizer located at a university campus central steam generating plant. The economizer was custom designed to provide a 5% efficiency boost to the overall plant operations, and was only the second installed at a U.S. university campus. The economizer was connected between two 80,000 PPH steam boilers and consisted of two indirect contact heat exchangers, its induction fan, and a direct contract water spray system the plant uses to preheat the combustion air and make-up water.

Wolff: Evaporative cooled data centers with hot aisle containment. We are seeing our customers moving away from the stringent temperature and humidity control requirements used earlier on when these types of structures were first introduced to the marketplace. This allows facility personnel to operate a data center at higher temperatures and use evaporative cooling versus the more expensive mechanical cooling. However, this results in systems that move significantly more air through the space, which introduces other project challenges. This puts additional focus and scrutiny on safety and staging when it comes to the sequence of operation and operating procedures.

CSE: Have you had experiences with photovoltaic (PV), wind turbine, or other renewable energy?

Szel: Yes, we have commissioned solar PV systems. The Solmetric PV analyzer is a good tool for testing IV curve performance and producing IV curve test results.

Wolff: Some, but most have been demonstration projects. We still consider these as “emerging technologies” and have not seen them used on “typical” commercial buildings.

York: Working with PV systems can be tricky. As such, designers and CxAs must pay particular attention to a couple of items. The first is how the panels are wired. Panels are commonly wired in a series fashion, and any break in series will cause the entire system to not operate. Second, panel orientation can also be an issue. For example, panels installed in an east-west pattern can cause the sun to be exposed to only half the panels at any given time, and will prevent the panels from operating at full power as some section will always be shaded. Re-orienting the panels into a north-south configuration can easily resolve the issue.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Big plans for small nuclear reactors: Simpler, safer control designs; Smarter manufacturing; Industrial cloud; Mobile HMI; Controls convergence
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.