Too little, too late?

My late grandmother—a World War II U.S. Marine Corps veteran—always had a Plan B. When things didn’t go quite the way she wanted them to, she’d move onto Plan B, equally as detailed as Plan A, but not necessarily her first-choice option.

03/22/2011


My late grandmother—a World War II U.S. Marine Corps veteran—always had a Plan B. When things didn’t go quite the way she wanted them to, she’d move onto Plan B, equally as detailed as Plan A, but not necessarily her first-choice option.

 

It may have been her Great Depression upbringing, based on the scarcity of goods during the time, that led her to have a back-up plan. The United States is again facing a scarcity of goods—this time energy and natural resources—partly because of our selfish demand for resources, and partly because there just aren’t enough natural resources to go around. This scarcity is causing an energy crisis.

 

The Obama Administration has done its due diligence for energy efficiency. Almost immediately after he entered office, President Obama announced that the Dept. of Energy, under the leadership of Steven Chu, would receive billions of dollars to support energy efficiency, renewable energy, and Smart Grid projects. The change in politics and public sentiment, however, may slow some of these programs and stop others.

 

But why are we—just now—passing all these laws and releasing all these federal funds? Can standards organizations ramp up their energy-efficiency codes and push the envelope even further? Why do I receive press releases from energy efficiency and sustainable organizations every time something goes “green”? When will building owners understand that it’s the capital cost, in tandem with the lifecycle cost, that determines the overall cost of a building system? All of these should be de facto.

 

Engineers have known for a long time that energy efficiency is the key to a sustainable, efficient structure. However, in some cases engineers do only what the client requests. Rather than using Plan A—leading our buildings and owners toward more efficiency—Plan B has gone into effect. Engineers need to be proactive rather than reactive, and apply their smarts and software beyond designing systems to helping owners understand the short-, mid-, and long-term benefits of better buildings. (This topic is covered in an on-demand webcast available at www.csemag.com/webcasts.)

 

It’s not just design engineers anymore. The new construction recession has put a lot more pressure on owners to invest in existing buildings. Thus, the fields of retrocommissioning, continuous commissioning, and energy management services have exploded in the United States.

 

A scarcity of natural resources, current circumstances in the Middle East, national political and economic uncertainty, and a burgeoning energy-efficiency market offer us all a great opportunity to help building owners understand that lifecycle cost and energy costs are part of owning a building, and that energy conservation or a minimization of resources promise a great return on investment.

 

Go for it.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.