Uncommon side: The slow learner -- part I

The qualifying test for Electrician Grade I was divided into two sections: written and hands-on. Both parts were timed. Four maintenance employees took the test. Three qualified; Joe Chernoff was the only rejectee.

05/01/1998


The qualifying test for Electrician Grade I was divided into two sections: written and hands-on. Both parts were timed. Four maintenance employees took the test. Three qualified; Joe Chernoff was the only rejectee. He had completed about 3/4 of the hands-on section, and 2/3 of the written part.

In giving Chernoff the news, Maintenance Foreman Harry Altshuler expressed his regrets.

It's not fair," Chernoff groused. "If I had been given more time to finish the tests, I would have qualified."

"Maybe so, but what's not fair? You were given the same amount of time as the others."

"That's the point," Chernoff said. "I have a learning disability -- attention-deficit disorder. Under the Americans With Disabilities Act, I'm entitled to additional leeway in taking tests in an effort to advance myself."

Altshuler disagreed. "If you were given special accommodation, everyone and his brother would come up with a reason to demand similar treatment."

Chernoff refused to settle for that and threatened to file a grievance claiming violation of ADA regulations.

Question: Do you think Chernoff has a viable case?

Please send your ideas on how to resolve this case to: Raymond Dreyfack, c/o Plant Engineering magazine, 1350 E. Touhy Ave., Des Plaines, IL 60018; fax 847-390-2656; e-mail cfirestone@ cahners.com.





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Additive manufacturing advancements; Machine vision enhances robotics; Fieldbus evolution; Process safety; Advice from System Integrators of the Year; Road to IANA
Salary and career survey: Benchmarks and advice; Designing controls; Remote data collection, historians; Control valve advances; Hannover Messe; Control Engineering International
System integration: Best practices and technologies to help; Virtualization virtues; Cyber security advice; Motor system efficiency, savings; Product exclusives; Road to Hannover
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
click me