University of Florida - East Campus Data Center

New construction; University of Florida - East Campus Data Center; Jacobs Engineering Group Inc.

08/15/2013


The east elevation/building entry of the University of Florida East Campus Data Center is shown. Courtesy: Whiting-Turner ConstructionEngineering firm: Jacobs Engineering Group Inc.
2013 MEP Giants rank:
1
Project:
University of Florida - East Campus Data Center
Address:
Gainesville, Fla., United States
Building type:
School (college, university)
Project type:
New construction
Engineering services:
Automation & Controls, Code Compliance, Electrical/Power, Fire & Life Safety, HVAC
Project timeline:
October 2009 to February 2013
Engineering services budget:
$8.5 million
MEP budget:
$8.5 million

The data center’s outdoor protected equipment yard is actually outside the building but under cover. Courtesy: Whiting-Turner ConstructionChallenges

The project consisted of two data halls with very different reliability requirements. One data hall required Tier 3 infrastructure and the other needed only Tier 1. Both data halls required scalability to accommodate significant future load growth and the potential for high-density deployment. In addition, the project targeted LEED-NC Version 3 Gold certification, which is an aggressive goal for a data center when following the LEED calculation methodology for baseline energy consumption.

Solutions

This photo shows the center’s equipment cabinets and cabling conveyance. Courtesy: Whiting-Turner ConstructionThe two data halls with different reliability requirements were designed utilizing a common central infrastructure to avoid stranded equipment capacity. The utility distribution systems were designed in a hybrid manner so that the Tier 3 data hall was provided with concurrent maintainability while the Tier 1 data hall was provided with a conventional distribution topology. Central cooling, UPS, and standby generation are all scalable, and provisions were made for deployment of liquid-cooled in-row solutions.

To maximize energy performance over the LEED baseline condition, the system utilizes high-efficiency central equipment and the thermal environment inside the data halls was designed in accordance with the thermal envelope of the 2008 supplement to ASHRAE's Thermal Guidelines for Data Processing Environments. This allows the use of elevated chilled water temperatures, significantly increasing the available operating hours on economizer in the climate of northern Florida and improving energy performance. The building and its systems were designed for safety in construction and operation, with ready access to parts requiring frequent inspection and segregation of people and equipment flows.

The project was designed using BIM on a Revit platform with Navisworks utilized for clash detection. This approach yielded better integration with Whiting-Turner, which led the Design-Build team, and the trade subcontractors. It improved the overall speed of project delivery and the quality of the final installation.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.