University updates fire pump

This case study describes redesigning the electrical system in one of the existing buildings at a university.

03/24/2014


Figure 4: Two different sources supply power to a single-ended substation. The substation feeds all electrical loads of the building including the fire pump. Courtesy: Jacobs EngineeringA project a couple of years ago involved redesigning the electrical system in one of the existing buildings at a university. Even though the building was four stories high, it was not classified as a high-rise as the floor level of the fourth floor was less than 75 ft high. The building was approximately 161,000 sq ft, and housed the university library. After discussions with the client, we decided that the fire pump would be electrically powered and be located adjacent to the main mechanical and electrical rooms, on the ground floor, near one of the entrances to the building.

The building was part of a multibuilding, campus-style complex powered through a radial loop distribution system at medium voltage. The service was then stepped down to 480 V in a new single-ended substation with a duplex primary switch. According to NEC 695.3(C)(1), “Two or more feeders shall be permitted as more than one power source if such feeders are connected to, or derived from, separate utility services.”

Both sources were considered reliable; therefore, we decided that there was no need for another alternate power source for the fire pump. To connect the fire pump controller, we decided to tap into the secondary bus of the substation (see Figure 4). Following 695.4(B), we installed a single disconnecting means and overcurrent protection in the electrical room. The overcurrent device was sized to handle the locked rotor load of the fire pump motor.

Because it was a fully sprinkled building, we decided that exception 695.6(A)(2)(d) applied, which states that “The supply conductors located in the electrical room where they originate and in the fire pump room shall not be required to have the minimum 2-hour fire separation or fire resistance rating…”. We ran the conductors in EMT conduit while in the electrical room and in the fire pump room. The conduit run between the rooms was encased in 2-in. concrete.


Eduard Pacuku is electrical project engineer at Jacobs Engineering, where the majority of his time is spent designing electrical distribution systems for universities (including laboratories), health care facilities, and data centers. He has extensive experience with fire pump installations.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Mobile HMI; PID tuning tips; Mechatronics; Intelligent project management; Cybersecurity in Russia; Engineering education; Road to IANA
Save energy with automation; Process control system upgrades; Dispelling controll myths; Time-sensitive networking; Control system integration; Road to IANA
Additive manufacturing advancements; Machine vision enhances robotics; Fieldbus evolution; Process safety; Advice from System Integrators of the Year; Road to IANA
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Flexible offshore fire protection; Big Data's impact on operations; Bridging the skills gap; Identifying security risks
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
click me