UPS efficiency and LEED certification

LEED certification for a project demonstrates a dedication to sustainability and energy efficiency.

06/25/2012


The U.S. Green Building Council (USGBC) LEED rating system is a voluntary national standard for green buildings. LEED certification for a project demonstrates a dedication to sustainability and energy efficiency. LEED certification requires a certain number of points for each recognized level (see “LEED certification levels”).

It is generally recognized that a majority of the LEED points toward project certification can be obtained through site selection, as well as civil, architectural, and mechanical systems. However, in some situations, the last few points required for project certification can be very expensive. An innovative and LEED-experienced data center electrical contractor can be a very important team member on most LEED projects. The points obtained through innovative data center design and construction practices can help maximize energy efficiency.

The electrical contractor should be an interactive LEED team member. It is beneficial for the entire project to have a data center contractor with LEED engineering knowledge and experience. The data center contractor must apply LEED protocols during construction at the job site.

LEED certification requires innovative design input from all design and construction entities. Through selection of energy-efficient electrical UPS systems, the electrical contractor can help generate several points toward project certification.

Energy and atmosphere credit No. 1: optimized energy performance is USGBC’s most important LEED credit as reflected in the number of available points. Projects earn points based on their Energy Star score, which is derived from their actual energy use during the performance period. Energy-efficient buildings can exceed energy code requirements through efficient mechanical, electrical, and lighting system design. If the building’s energy use is less than the energy code by a minimum of 12% for new buildings or 8% for existing buildings, the project can obtain LEED points (see “Optimized energy performance scoring chart”).

The prerequisite for the minimum energy performance category is to meet the minimum energy efficiency level of either ASHREA/IESNA 90.1 or local energy codes, whichever is more stringent.


Lane is president and CEO of Lane Coburn & Assoc. He is a member of the Consulting-Specifying Engineer editorial advisory board.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Big Data and IIoT value; Monitoring Big Data; Robotics safety standards and programming; Learning about PID
Motor specification guidelines; Understanding multivariable control; Improving a safety instrumented system; 2017 Engineers' Choice Award Winners
Selecting the best controller from several viewpoints; System integrator advice for the IIoT; TSN and real-time Ethernet; Questions to ask when selecting a VFD; Action items for an aging PLC/DCS
This digital report will explore several aspects of how IIoT will transform manufacturing in the coming years.
Motion control advances and solutions can help with machine control, automated control on assembly lines, integration of robotics and automation, and machine safety.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Future of oil and gas projects; Reservoir models; The importance of SCADA to oil and gas
Big Data and bigger solutions; Tablet technologies; SCADA developments
SCADA at the junction, Managing risk through maintenance, Moving at the speed of data
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Jose S. Vasquez, Jr.
Fire & Life Safety Engineer; Technip USA Inc.

(copy 5)

click me