UPS efficiency and LEED certification

LEED certification for a project demonstrates a dedication to sustainability and energy efficiency.

06/25/2012


The U.S. Green Building Council (USGBC) LEED rating system is a voluntary national standard for green buildings. LEED certification for a project demonstrates a dedication to sustainability and energy efficiency. LEED certification requires a certain number of points for each recognized level (see “LEED certification levels”).

It is generally recognized that a majority of the LEED points toward project certification can be obtained through site selection, as well as civil, architectural, and mechanical systems. However, in some situations, the last few points required for project certification can be very expensive. An innovative and LEED-experienced data center electrical contractor can be a very important team member on most LEED projects. The points obtained through innovative data center design and construction practices can help maximize energy efficiency.

The electrical contractor should be an interactive LEED team member. It is beneficial for the entire project to have a data center contractor with LEED engineering knowledge and experience. The data center contractor must apply LEED protocols during construction at the job site.

LEED certification requires innovative design input from all design and construction entities. Through selection of energy-efficient electrical UPS systems, the electrical contractor can help generate several points toward project certification.

Energy and atmosphere credit No. 1: optimized energy performance is USGBC’s most important LEED credit as reflected in the number of available points. Projects earn points based on their Energy Star score, which is derived from their actual energy use during the performance period. Energy-efficient buildings can exceed energy code requirements through efficient mechanical, electrical, and lighting system design. If the building’s energy use is less than the energy code by a minimum of 12% for new buildings or 8% for existing buildings, the project can obtain LEED points (see “Optimized energy performance scoring chart”).

The prerequisite for the minimum energy performance category is to meet the minimum energy efficiency level of either ASHREA/IESNA 90.1 or local energy codes, whichever is more stringent.


Lane is president and CEO of Lane Coburn & Assoc. He is a member of the Consulting-Specifying Engineer editorial advisory board.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.