US Army Adopts ASHRAE Standard 189.1

The United States Army has adopted ASHRAE Standard 189.1, which will include all new buildings and structures in both U.S. territories and abroad. The footprint of the existing Army buildings and structures covers more than 954 million square feet.

12/23/2010


U.S. Army officials issued their new sustainable design and development initiative that incorporates requirements of the green building ASHRAE Standard 189.1.

The policy applies to all construction and renovation of new buildings and structures in the U.S. territories, permanent overseas Active Army installations, Army Reserve Centers, Army National Guard facilities and Armed Forces Reserve Centers. The footprint of the existing Army buildings and structures worldwide covers more than 954 million sq ft.

Standard 189.1, published early in 2010 by ASHRAE in conjunction with the Illuminating Engineering Society of North America (IES) and USGBC, provides a green building plan for those who choose to design, build and operate green buildings. The policy addresses site sustainability, water use efficiency, energy efficiency, indoor environmental quality, and the building’s impact on the atmosphere, materials and resources.

The Army’s policy sets a new approach to the design and construction of efficient military construction projects and major renovations by using Standard 189.1 as the baseline. The policy requires that facility construction projects follow specified requirements and guidance in the standard.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.