U.S. District Courthouse for the Northern District of Iowa

New construction; U.S. District Courthouse for the Northern District of Iowa; KJWW Engineering Consultants

08/15/2013


This image shows the entrance to the U.S. District Courthouse for the Northern District of Iowa in Cedar Rapids. Courtesy: KJWW Engineering ConsultantsEngineering firm: KJWW Engineering Consultants
2013 MEP Giants rank:
29
Project:
U.S. District Courthouse for the Northern District of Iowa
Address:
Cedar Rapids, Iowa, United States
Building type:
Office
Project type:
New construction
Engineering services:
Code Compliance, Electrical/Power, HVAC
Project timeline:
April 2009 to July 2012
Engineering services budget:
N/A
MEP budget:
$1.48 million

Challenges

The new 287,600-sq-ft LEED Gold federal courthouse in Cedar Rapids presented many challenges due to the often-competing security and sustainability requirements of the General Services Administration (GSA). At the same time, KJWW needed to make sure the systems designed to address these challenges did not undermine the architect’s “Big ideas of the building,” which included a 59,675-sq-ft glass curtain wall facing north and a spacious atrium in the center which splits the building into two distinct sides. The GSA mandated that the building be extremely energy efficient, using no more than 55 kBtu/sq ft each year. The GSA’s security criteria, meanwhile, included such items as enhanced steel reinforcements and systems with greater-than-normal energy use, such as security-based lighting and continuously-running dedicated ventilation for holding cells and mail room.

The most overlap between security, HVAC design, and sustainability occurred in the air distribution design. The GSA’s Facilities Standards for the Public Buildings Service (PBS P100) requires that no air handling unit (AHU) can be larger than 25,000 cfm and no unit can serve more than one floor. With 287,600 sq ft over eight floors, split in two sides (courtroom side and tenant side), there had to be an AHU for each floor on each side (16 total AHUs). In addition, code required each AHU to bring in outside ventilation air, but the GSA’s anti-terrorism standards do not allow for any air intake below the 4th floor, and the architect did not want any air intake or relief on any exterior walls. Traditional mixed air AHUs normally would have air economizers, which bring in air from the outside to condition the building when outside air conditions are right. For the courthouse, this would have required each floor’s AHU to be ducted to the roof. With all the required AHUs, such a system would have a far greater need for mechanical room space, something that was not cost effective where floor space was at a premium and being built at $300 to $400 per sq ft.

Solutions

To meet the GSA’s energy efficiency goals and security requirements and not compromise key architectural features, KJWW developed two key solutions which were supported through energy modeling evaluations by The Weidt Group:

  1. Elimination of the outside air capability for all AHUs and installation of a completely decoupled dedicated outside air system. Two units on the ground floor have the sole purpose of providing outside air for the building. They draw in air from the roof, condition it, and send it through the building for ventilation air. They also take all the air that they put into the building, bring it back to the units, and exhaust the air at grade level. The outside air coming in and the exhaust air going out exchange energy through enthalpy wheels (another energy-saving measure).

  2. The use of water economizers instead of air economizers for the AHUs. Water economizers create chilled water by routing the chiller system condenser water outdoors to be cooled by the cold ambient air, and then use that cold water to cool the indoor system chilled water via a heat exchanger. The system creates chilled water in the winter without having to run mechanical cooling. Water economizers have their own challenges, however. Ice can form on the cooling tower in the colder months. During transitional months when days are warm but nights are still cold, the mechanical chillers, needed during the day, often don’t start up easily when there is still cold water coming to them from the water economizer that may have operated overnight. The engineers developed a control sequence for going from one system to the other during these periods to ensure the system ran reliably.

Commissioning played a critical role in verifying the systems operated as designed. Although the water economizers added a degree of operation complexity, KJWW and the GSA determined that the water economizers would cost far less on a lifecycle basis than air economizers, which would have required larger air handling rooms throughout the building. In addition, the chases and chase space required by air economizers for intake and relief would have been impractical for the building, where floor space was at a premium. Another key energy-saving feature was the use of electric “point-of-use” water heaters instead of a central hot water system, since there is not much need for hot water in the building.

While gas is less expensive for heating water, installing small point-of-use electric heaters where the water is needed—at each sink or bathroom group—eliminated the need for central storage of hot water, distribution and recirculation piping, saving all the cost involved and eliminating “parasitic” heat loss. As for the glass curtain wall, members of the core design team traveled to Washington, DC, where the GSA’s HVAC Peer Review panel accepted the engineers’ solution that flushing air along the wall would prevent condensation. 



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.