VISN 7 Medical Center Retro-commissioning Project

Existing building retrofit; VISN 7 Medical Center Retro-commissioning Project; Sebesta Blomberg

08/15/2013


Atlanta VA Medical Center. Courtesy: Sebesta BlombergEngineering firm: Sebesta Blomberg
2013 MEP Giants rank:
33
Project:
VISN 7 Medical Center Retro-commissioning Project
Address:
Various; Tuscaloosa, Ala.; Decatur, Ga.; Augusta, Ga.; Charleston, S.C.; Columbia, S.C.; Montgomery, Ala.; Birmingham, Ala.; Tuskegee, Ala.; Dublin, Ga.; United States
Building type:
Hospital
Project type:
Existing building retrofit
Engineering services:
Cx/Retro-Cx
Project timeline:
January 2010 to December 2013
Engineering services budget:
$3.13 million
MEP budget:
$3.13 million

Challenges

The challenge of the Retro-commissioning Program within VISN 7 (Southeast United States) was to improve energy efficiency, operations, and customer experience through improved environmental control of each facility. The project includes 10 VA campuses comprising of over 7.5 million sq ft of acute care, psychiatric care, and medical support facilities, generally constructed between 1930 and the first decade of the 2000s. The program was developed in response to the Energy Policy Act of 2005 and Executive Orders 13423 and 13514 that require an overall energy reduction of 30% by 2015 and a reduction in water use of 20% by 2015. The overall program objectives included training O&M staff, institutionalizing good operating practices, reducing operating costs, improving performance, extending building lifecycle, improving customer satisfaction, and providing safe and healthy buildings.

Solutions

Sebesta Blomberg began the retro-commissioning process with a thorough inspection and condition assessment of the energy and water consuming systems at each site. Based on the findings of the initial inspections, the firm identified components that required repair, replacement, or upgrades to allow it to reasonably evaluate the ability of the systems to satisfy the mission of the VA at an optimal energy profile. The project included funds to complete these items prior to follow-on system testing, system improvements, and staff training.

As part of the project, Sebesta Blomberg engaged the operating teams in the retro-commissioning process. Through their engagement, the firm was able to leverage their experience in operating these complex facilities, understand the unique operating demands of each facility, and begin a training process that was designed to build on the technical competencies at each individual site.

Once retro-commissioning testing was complete, the firm was assigned the task of implementing as many of the “quick-fix” and “deferred maintenance” items within the budget to achieve real savings at each VISN 7 campus.

In the end, the program resulted in a total reduction in energy use of 15% and a reduction of water consumption of 4%. The VA expended a total of $11 million on the retro-commissioning program that resulted in $3.5 million in energy and water savings. The overall program payback, all costs included, was 3 years.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.