Water treatment plant upgrade saves with SCADA software

When the German government introduced new wastewater treatment regulations several years ago, engineers at the 25-year-old Düsseldorf South Water Treatment Facility faced a C 116-million upgrade project to satisfy the rules, called Abwasser Technische Verordnung (ATV).In 1994, plant engineers began implementing new secondary wastewater treatment processes, Belebungsbecken—a tra...

05/01/2000


When the German government introduced new wastewater treatment regulations several years ago, engineers at the 25-year-old Düsseldorf South Water Treatment Facility faced a C 116-million upgrade project to satisfy the rules, called Abwasser Technische Verordnung (ATV).

In 1994, plant engineers began implementing new secondary wastewater treatment processes, Belebungsbecken—a traditional aerobic process that mixes wastewater with naturally occurring, biologically active microorganisms that consume organic waste components. This biological nitrification/ denitrification is accelerated with injections of compressed air. Wastewater temperature and pH are the two crucial parameters measured and controlled during this process.

The main innovation included in Düsseldorf South's upgrade was implementing nitrification/denitrification in one simultaneous process. Wastewater swirls through five, flat, open-air, 23,200-m3tanks divided into four channels with oxygen supplied by compressed air blown in by four turbines. The plant's engineers estimate they were able to save about C 30 million by using PC-based control and PLC-related supervisory control and data acquisition (SCADA) technology, along with help from local industries.

New control, visualization

Main contractor for the project, Schneider Electric Germany, selected systems integrator Inotronics GmbH as subcontractor to implement the plant's new process control system using P-CIM software from Afcon Projects (84) Ltd. The entire control system upgrade, including communication links, was installed from January to May 1999.

Twenty workstations running P-CIM supervise, manage, collect, and display process data in a control room, throughout the plant, and even at Düsseldorf's city hall. The control system handles 16,000 I/O points, which will be expanded soon to 35,000. Eighteen redundant pairs of Schneider's Telemecanique TSX-7 PLCs—working in a redundancy configuration—also handle process control. All controllers are linked to the control room via fiber-optic cable.

The plant's PC-based visualization system on the 20 workstations is connected to redundant sets of data servers via a redundant 100 Mb Ethernet fiber-optic communications network. Response time is reportedly less than 0.5 sec. One operator can work with as many as 10 different screens. At night—when input variation is lowest—three operators can control the entire plant. To ensure communication system reliability, dual network cables, hubs, PLCs, and software redirecting support, were also implemented. Real-time data are read into the communication server, stored in the archive server, and distributed to the operation workstations.

To reduce process variation and move the plant from continuous empirical process to a batch control operation, the engineers use the new SCADA software to track and plot input variables and results. They want to formulate recipes for different "batches" of water received, which can vary according to season, rainwater amounts, and proportions from private homes, businesses, and manufacturing facilities.

P-CIM also allows the plant's PC-based SCADA system to perform historical data collection into an SQL data server, which allows the engineers to study and refine the treatment process. And, as the process moves from continuous to batch control, recipe management is allowing engineers to dynamically modify a recipe's structure and values.

For more information, visit www.afcon-inc.com ; visit www.schneiderelectric.de ; or visit www.controleng.com/freeinfo .

Control Engineering Europe staff based on a visit to the site and technical information supplied by Thomas Wagner, Inotronics GmbH, Köln, Porz-Urbach, Germany.



ONLINE

For an expanded version, see Control Engineering Europe, January-February 2000, at



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Salary and career survey: Benchmarks and advice; Designing controls; Remote data collection, historians; Control valve advances; Hannover Messe; Control Engineering International
System integration: Best practices and technologies to help; Virtualization virtues; Cyber security advice; Motor system efficiency, savings; Product exclusives; Road to Hannover
Collaborative robotics: How to improve safety, return on investment; Industrial Internet of Things, Industrie 4.0: World views; High-performance HMI, Information Integration: OPC and OMG
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
click me