Work order management: 10 hurdles to overcome

Establishing and maintaining an effective and efficient work order management system can be very similar to running a 400 meter high-hurdle race and winning.

03/21/2014


Establishing and maintaining an effective and efficient work order management system can be very similar to running a 400 meter high-hurdle race and winning. However, where just one hurdle can cause considerable damage, PE1403_WEB_IMG_Jerry-Wanichkoit’s vital to ensure that they are promptly identified and addressed. In the context of T.A. Cook´s experience with clients based in North America, the following list includes the 10 largest hurdles Maintenance Managers face, as well as suggestions for how they can best be overcome. 

  1. Not properly writing a work notification
    If notifications can’t be understood or found easily, they can’t be fixed. Send them back to the originator and explain why they are not fit for purpose.
  2. Lack of discipline and understanding
    When everything is a priority, nothing is a priority: not understanding or lacking the discipline to follow a simple prioritization system is a key issue that absolutely must be addressed by Managers. Also, when a 1-2-3 priority system degenerates into having 2a, 2b, 3a, 3b, then the discipline has deserted the system. Go back to basics; redefine the priority system, keeping it simple. Create a one-page visual aid and post it everywhere work notifications are created, discussed or reviewed.
  3. Absence of notification gates
    Not having a “gate” between notification and conversion to approval and not tracking the rate means you are wasting time: not every notification needs to be approved. If the approval rate hasn't been properly defined, too many are getting through. 
  4. Ignoring planning capacity
    Planners have a finite planning scope each week and they need to know which work orders are the most critical: otherwise the risk of not having enough planned work to build a full schedule is high. Additionally, failing to properly plan work orders - including poor work estimates, omitting steps, tools and equipment - and not following a standard for building a complete work package creates lost time in execution.
  5. Scheduling by tasks or activities instead of by work order 
    If scaffolding is still up all over the place after jobs are complete, this could be where the error occurs. It also increases the complexity of coordination between craft and specialty equipment such as cranes. 
  6. Not challenging “break-in” work and lazy scheduling
    Schedule break-ins are often simply accepted, leaving managers in fire-fighting mode and ensuring that the backlog will just grow and grow. Similarly, not tracking the rate of rejection or acceptance means the schedule of planned work will never be attained. Additionally, issuing a weekly schedule and then conducting daily meetings to agree what will be worked on during the following day means that a weekly schedule won´t be followed. You operate to a daily work list.
  7. Absence of short-interval-control
    Not employing short-interval-control during the workday to manage and when necessary problem solve issues to keep the work flowing. Set the expectation that first line management must tour the area every 2 hours. Provide coaching to the first line to reinforce pro-active management behaviors during the short-interval-control tours.
  8. Leaving finished work orders open
    Not closing out work orders which are completed keeps the backlog inflated and confusing.
  9. Bad documentation
    Not documenting errors or omissions in work plans or packages and not getting this feedback to the right Planner means the packages will never get any better nor will the craft increase efficiency.
  10. Poor KPI standard or relevance
    Not having the right set of key performance indicators or metrics to track and review your performance against the previous hurdles or only reviewing performance monthly renders the very existence of KPIs redundant: monthly metric reviews are only marginally better than no review.

If any of the above hurdles are familiar to your organization, money is being wasted and the maintenance budget will overrun. 

Jerry Wanichko is Director of Consulting Operations North America for T.A. Cook Consultants, Inc.

 



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.