Project: Baton Rouge Wastewater Pump Station SCADA System – 2006-06-06

By Control Engineering Staff June 6, 2006

June 6, 2006

As the new project engineer on this job I have spent the last couple of weeks getting up to speed on the scope of the job and all of it’s requirements. At the same time I have been familiarizing myself with the software and hardware for the project. There are some items which need to be completed before we move on to the next phase.

The past week has seen much progress toward the item on the first graphics review punch list. Our focus is on perfecting the graphics screens, control functions, and redundancy aspects of the system, as mentioned in the punch list, before replicating the system to other pump stations.

Some of the items in need of attention require input from the City and therefore a meeting has been set up for this week to discuss reporting issues, call lists, maintenance logs and input devices.