The ‘right’ technical services and support capabilities for CNCs will maximize uptime, boost profits, and reduce maintenance costs.

02/26/2013


In-house CNC repair can include emergency handling. Courtesy: Mitsubishi Electric AutomationWhile mechanical failures are inevitable, keeping metal cutting machinery in production and working properly is essential for end users to achieve maximum uptime and efficiency in their production operations. When a mill, lathe, or any other piece of CNC machinery in production goes down, it causes a major expense and problems for end users. Lost revenues and labor costs, combined with the fact they may not be meeting their key performance indicators (KPI) goals, quickly elevate tension levels on the shop floor.

Repairing machinery and equipment that has failed and then getting it back into production becomes of paramount importance. This is typically when an end user becomes concerned or acutely aware of the quality of service, maintenance, and repair capabilities it receives from its CNC builder or lack thereof. The basics should include: CNC training courses, product maintenance and support contracts, product enhancements, technical phone support, online support, parts, repairs, and field support. Equally important, the end user should find out what the machine CNC builder’s lifecycle support policy is for supporting its CNC controls— for 2 years, 5 years, and 20 years from now.

When an end-user encounters a problem with its CNC equipment, there are some basic benchmarks to consider in terms of “measuring” the quality of service and technical support capabilities it is receiving from the control’s manufacturer.

1. Quality of telephone, online support

Advanced interaction call center helps with CNC issues. Courtesy: Mitsubishi Electric AutomationHow quickly does the manufacturer answer phone calls? Most CNC manufacturers’ technical support and service call centers should answer calls in just a few minutes or less. If cue times are longer than 2 minutes on a consistent basis, there might be a problem with the level or quality of phone support compared to most standard call center benchmarks.

What kind of response and attention does the service engineer provide when discussing the service or repair problem? Does the service person seem knowledgeable and understand all the particulars of the failed product and the maintenance situation? Most importantly, does he or she help resolve the problem quickly? Control vendors should staff call centers with factory-trained service engineers equipped to deal with the most difficult service issues; otherwise, the quality of technical phone support may suffer and frustrate callers. To facilitate the process of resolving equipment problems via telephone support, custom-built CNC diagnostics stands and simulators can help the tech support engineers reproduce similar problems to effectively determine the changes needed to rectify the situation.

2. Parts, repairs, field service turnaround time

A collaborative customer service approach with senior-level engineers can guide resolution of CNC issues. Courtesy: Mitsubishi Electric AutomationOnce the problem is determined, how quickly does the control vendor turn around parts and repair orders? Again, there are some metrics, turnaround goals, and averages CNC manufacturers should offer for parts, repairs, and field service. In most situations, CNC vendors should be able to turn around parts orders in one day, barring unforeseen circumstances.

For repairs that require field service calls, the response time goal should be 24 hours for a service technician to arrive at a facility. Expect to pay for premium support services, such as emergency handling of in-house repairs or door-to-door service.

In the final analysis, machinery and equipment should return to production within three days on average. This is not taking into account any unusual problems or issues that may change these response times. CNC manufacturers should be able to quote or state service and response time goals. In addition, they should also be tracking and monitoring effectiveness in reaching these goals consistently.

3. Out of the box thinking, support

Comprehensive CNC training courses are conducted by experienced instructors. Courtesy: Mitsubishi Electric AutomationOne of the most important and overlooked aspects of technical services and support that is somewhat difficult to measure and quantify is whether a CNC manufacturer is taking a “proactive approach” to solving problems. This falls under the category of preventive maintenance. By taking some simple, proactive measures, the end user can completely avoid some common repair issues and expenses.

Many times, the same equipment failures occur repeatedly at an end user, without much thought given to determining the root or source of the problem. Rather than immediately sending a replacement part when the same problem reoccurs, investigate what actually caused the problem. Often the culprit is lack of simple maintenance and care.

For example, an end user might be having servo issues and replacing amplifiers only to find out it instead needed to replace some bad bearings to solve the problem at hand. Or maybe the end user isn’t cleaning its heat exchangers or cooling systems in the electric cabinets. With excessive heat buildup, it’s only a matter of time before electronic equipment begins to fail. We see this happen very often with customers.

Another common problem is when a customer shuts down a plant for a period of time for a holiday break or retooling effort. Two weeks later when booting up the system, the customer discovers that all the control’s memory is lost or the data is scrambled, simply because no one checked the voltage on the batteries before shutting down. Although it is necessary to back up control data and parameters, the machine tool builder may provide backups of the control’s original parameters. If the data is lost, contact the CNC vendor to see if it maintains a library on its server available for access. Either way, the point is to ensure control parameters are copied and data backed up at all times.

Finally, does the CNC vendor recommend or offer a parts package for spares? Many CNC systems have some common parts and components that would be very handy to have in reserve when a situation arises, saving time in responding to and fixing a problem. As experts in control, the CNC vendor should provide information about these opportunities to simplify future maintenance.

These are some next-level initiatives that a CNC vendor can offer to help end users avert unnecessary issues and quickly resolve problems, such as repairs, parts orders, or field service support.

Russell Pobutkiewicz is project manager, technical support and services, Mitsubishi Electric Automation Inc. Courtesy: Mitsubishi Electric AutomationThe “right” kind of technical service programs and support capabilities, combined with proactive thinking, allows end-users to achieve maximum CNC system uptime, maximizing profits and reducing overall operational costs.

- Russell Pobutkiewicz is project manager, technical support and services, Mitsubishi Electric Automation Inc. Edited by Mark T. Hoske, content manager, CFE Media, Control Engineering and Plant Engineering, mhoske(at)cfemedia.com

Online

www.meau.com 

See related article linked below.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Big plans for small nuclear reactors: Simpler, safer control designs; Smarter manufacturing; Industrial cloud; Mobile HMI; Controls convergence
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.