The new, more streamlined SPM Simplified Frac Iron System marks an important advancement that increases operational efficiency. Traditional frac operations involve hundreds of moving parts and small-bore iron strings to manage extremely high pressures. Every connection represents a potential leak path – and creates substantial NPT. The simplified system is preassembled on multiple skid/trailer configurations. It radically reduces the footprint and amount of iron required for operations as well as NPT, potential leak paths, rig-up time, labor costs and safety hazards. Multiple configurations enable customers to move skids around with each rig-up to balance wear across assets.